top of page

PILE CAP S250

SPECIFICATIONS

​

  • Bolting Pattern:
    140mm centres x 4 x 22mm holes

  • Micro Piles:
    4 x 32NB (Nominal Bore) 42.40D
    Galvanised Pipe Light, Medium,Heavy

  • Load Capacity:
    Up to 100kN

  • Average installation time:
    10 minutes approx

Screen Shot 2019-01-29 at 10.28.42 am.pn

Container Supports

The Pile Cap S250 provides support of up to 110kN and can be erected in a time efficient manner, eliminating downtime and excessive labour costs. Featuring a design capacity calculated on the working stress method and using refined geotechnical data, your container/s can be erected quickly and securely reducing the lack of productivity often associated with the more traditional forms of footings. A multi-purpose footing the Surefoot system is an innovative alternative in all construction applications where a concrete footing can be used.

Screen Shot 2019-02-04 at 2.13.56 pm.png

Cyclone Tiedowns

Offering cutting edge steel footings that are suitable for all construction work in need of a foundation, the Surefoot concrete free footing provides superior loading capabilities when compared to screw piers and conventional footings such as bored and concrete piers. Both quick to install and dismantle the footings are fully recyclable and can be returned to their raw state in order to produce more steel footings when required. Providing optimal stability and minimal soil and substrate disruption, they are the footing of choice for cyclone tie downs. Tested and certified in cyclonic prone areas, ensure your building project is optimally protected and built to withstand uplift, shear and environmentally challenging conditions. The Surefoot can be installed in all wind categories.

Screen Shot 2019-02-04 at 2.13.50 pm.png

From concept to concrete slab

With an average installation time of approximately 10 minutes, the use of a Surefoot Footings Pile Cap S250 will provide a sturdy footing in which to pour a concrete slab, ensuring reduced down time between the construction stages. Effectively negotiating the impact of reactive soil issues when building homes, the concrete slab is suspended allowing the soil to move beneath without pressure to the slab.

Screen Shot 2019-02-04 at 2.19.19 pm.png

Public Playgrounds

Preparation is key when planning construction in collaboration with your local council.The construction of a public structure is heavily regulated and requires absolute precision. Not only is there personal and public liabilities involved, the structure needs to be secure and meet regulatory requirements when used by children. The Pile Cap S250 will create a footing that spreads over a greater surface area, achieving larger load capacities in a cost effective, secure and time efficient manner.

Retaining Wall

A retaining wall typically is one that is built to sustain a significant lateral soil pressure and may be a curved, short or even tall retaining wall. The Pile Cap S250 forms a steel footing that connects the structure to the ground with security, flexibility and the ability to handle large bending moment loads and differing site soil conditions. Neither a shallow nor deep structure it is a hybrid footing system that has eclipsed the use of both screw piers and bored piers.

Residential Housing

From modular residential homes to large decking projects, the Pile Cap S250 is superior to the more traditional foundation such as screw piers in cost effectiveness, labour and time efficiency. Designed to adapt to undulating terrains and ground movements, this concrete free foundation system is ideal for construction sites with limited access and will negotiate various soil types, ensuring your housing project is supported by the fully recyclable.

Screen Shot 2019-01-24 at 2.23.50 pm.png
Screen Shot 2019-02-04 at 2.13.38 pm.png
Screen Shot 2019-02-04 at 2.13.33 pm.png
bottom of page